lynwood high school

OUR PROJECTS

OUR PROJECTS

lynwood high school

LOCATION: Lynwood, CA - STATUS : In Construction - COMPANY: Bernards

The reconstruction of Lynwood High School is well underway, and Van Diest Bros. has completed the majority of its wet-utility scope.

With a formal groundbreaking in 2024, the Lynwood High School reconstruction includes a comprehensive rebuild of the main classroom building, upgraded campus utilities, and significant improvements to athletic fields, infrastructure, and student facilities — creating a modern, state-of-the-art learning environment for the Lynwood community.

Van Diest Bros. was contracted by Murray Construction Services Inc. to deliver a full wet-utilities package (storm drain, sewer, domestic water, and fire water) for the project. Bernards and Huckabee are leading the project as general contractor and construction manager, respectively.

Van Diest Bros. provided BIM coordination services during preconstruction and installed nearly 1800' of sewer pipe, 1500' of fire service pipe, 3000' feet of storm drain, 17 manholes and 24 catch basins.

Van Diest Bros. is proud to play a role in the reconstruction of a community cornerstone, supporting the delivery of modern infrastructure that will benefit students, staff, and the broader Lynwood community for years to come.

PROJECT HIGHLIGHTS:

  • BIM Coordination Services

  • 3000 Linear Feet of Storm Drain Pipe

  • 1500 Linear Feet of Fire Water Pipe

  • 1800 Linear Feet of Sewer Pipe

  • 17 Manholes

  • 24 Catch Basin

Previous
Previous

FCS CSULB | Long Beach CA

Next
Next

UCI Lifepoint | Irvine CA